• 18312 N Mt Spokane Park Dr., Mead WA 99021
  • (509) 238 - 5137
  • info@finnoedesign.com

Oklahoma City Railroad Bridge Falsework

This bridge was an active railroad bridge over a congested freeway.  The bridge was assembled close by and transported overnight into location to minimize disruptions to rail and road traffic.  Our scope was to fabricate pedestal framing between the dollies and the bridge.  The project was completed on time with no field assembly problems.

 

2017
Oklahoma City, Oklahoma
Temporary Steel Fabrication